Sunset Ridge School District 29 completed the renovation work on Middlefork School in August 2019. A portion of the work included replacement of all domestic water piping. As a result, the District contracted with Gallagher Bassett Technical Services to conduct lead in water testing as a follow-up to the testing that was completed in 2016. The results can be found by selecting the links below.
Middlefork School -
Lead In Water Testing results
Middlefork School -
Lead In Water Testing lab report